Toni, Toni, and Hendri Hendri. 2024. “Planning of Uwe River PLTMH Jayawijaya Regency Capacity 2 X 750 KW”. Jurnal Indonesia Sosial Sains 5 (09):2207-25. https://doi.org/10.59141/jiss.v5i09.1232.