Toni, T., & Hendri, H. (2024). Planning of Uwe River PLTMH Jayawijaya Regency Capacity 2 X 750 KW. Jurnal Indonesia Sosial Sains, 5(09), 2207–2225. https://doi.org/10.59141/jiss.v5i09.1232