[1]
Toni, T. and Hendri, H. 2024. Planning of Uwe River PLTMH Jayawijaya Regency Capacity 2 X 750 KW. Jurnal Indonesia Sosial Sains. 5, 09 (Sep. 2024), 2207–2225. DOI:https://doi.org/10.59141/jiss.v5i09.1232.